Glossary
32 terms, one page each, cross-linked. Every definition restates something already published in a technical paper on this site — none of them introduces a figure or a claim the papers do not carry, and a build guard enforces it.
A
- AcclimationThe period during which flooring material equalises to the conditions of the room it will be installed in — a minimum of 72 hours, in the actual conditioned space.
- AnisotropicDescribes a material whose properties differ by direction — in wood, movement across the grain is significant while movement along it is minimal.
B
- Belt floor sanderalso drum sander, the big machineThe primary material-removal machine in a refinish: a continuous abrasive belt over a drum roughly 200 mm wide, handling around 80% of total removal.
- Bucklingalso tentingA floor that lifts off its substrate because it expanded and had nowhere to go.
- Bufferalso screening machineA single-disc rotary machine, typically 400–500 mm, fitted with fine screens around 100–150 grit — it removes microns, not wood.
C
- Change orderA mid-project price increase — on a hardwood job, most often for substrate conditions that a proper assessment would have found before quoting.
- Cross-ply coreThe layered substructure of engineered flooring, with each layer oriented at 90° to the one beside it.
- CrowningA board whose centre sits higher than its edges — the inverse of cupping.
- CuppingA board whose edges sit higher than its centre — the visible record of moisture entering the floor from below.
E
- Edge peakingRaised board edges with associated finish failure along the seams, following movement the finish could not accommodate.
- Engineered hardwoodFlooring that pairs a real hardwood wear layer with a 90° cross-ply core, which is what gives it dimensional stability over concrete, in condominiums and above radiant heat.
- Expansion gapDeliberate clearance left at walls and at every fixed object so the floor has somewhere to go when it expands.
F
- Fixed priceA price written in the estimate that is the price paid, with no open-ended change-order language for conditions that should have been tested on day one.
- FloatingInstalling flooring so it rests on the substrate without being fastened or bonded to it — correct over radiant heat, or where acoustic separation is required.
- Floor edgerA compact high-speed rotating disc, typically 150–178 mm, that reaches walls, baseboards, closets, stairs and under cabinets — everywhere the belt sander physically cannot go.
M
- Moisture contentalso MCThe proportion of water in wood or in a subfloor, measured before installation and used to decide whether the two are compatible.
- Moisture differentialalso moisture delta, MC differentialThe difference between the moisture content of the flooring material and that of the subfloor, which must sit inside an acceptable range before installation.
P
- Planetary sanderalso multi-disc sanderA refining machine with three or more counter-rotating discs on a rotating head, producing a random multi-directional scratch pattern that blends field into edges.
- Progressive gritsWorking through abrasives from coarse to fine in sequence, with the perimeter matching the field at every step.
R
- Radiant heatAn in-floor heating assembly that imposes a thermal cycle on the flooring above it, in addition to the seasonal humidity cycle.
- Relative humidityalso RHThe amount of water vapour in the air relative to what that air could hold at its temperature — the environmental variable a hardwood floor actually responds to.
S
- Seasonal gappingVisible gaps that open between boards as the floor contracts, typically in a dry Toronto winter.
- Solid hardwoodFlooring milled from a single piece of wood, typically 3/4" (19 mm), with a generational wear layer and high sensitivity to humidity swings.
- Subflooralso substrateWhat the finished floor is installed onto — plywood over joists, a concrete slab, or a radiant assembly — and the thing that determines the installation method.
Provenance
Why every entry cites a paper
A glossary is only worth reading if it is right, and the only way to keep one right at scale is to make every entry a view onto something that was already reviewed. When a term needs substance no paper covers, the paper gets written first.